PT Total Inpro Multitech is the best Schneider Electric Indonesia system integrator for 2 consecutive years (2013-2014), whose focuses on providing the best solutions for Automation, Electrical and Instrumentation as contractor, distributor, consultant, training, maintenance and engineering services. It was established in 2008. located in Jakarta, Cibitung and Bali. To read more about please visit www.totalinpro.com
OUR Solutions
Schneider : PLC, Inverter, SCADA, HMI, MES.
Beijer : HMI
Phoenix Contact : Surge Protection, Terminal Block
Atop : Networking , Protocol Converter from DNP3, 61850
Local Panel, Rittal Panel, Trafo , Lv Components.
- Electrical Test and Maintenance
- Coal Handling Solutions
- Boiler Control Systems
- Automation Product and Consultant
- Energy Efficiency Consultant
- Emergency Shutdown System
- Manufacturing Execution System
- Energy Management Solutions
- Crusher System
OUR SUCCESS STORY
ENERGY MANAGEMENT SOLUTION AT BORAL JAYABOARD CILEGON
- This project is used as a reference the billing month of PLN
- Can be used to determine total energy consumption and energy consumption per shift of the production process
COAL GASIFICATION PLANT CONTROL RECONDITION AT KRAKATAU STEEL CILEGON
- This project is used to monitor and control Coal Gasification Plant
- Consists of 5 process: Coal Feeding, Coal Charging, Soft Water, Tar Catcher, Gas Analyzer
COCA COLA
- Optimization of the system and reconditioning of SEPAM
- SEPAM is relay protection from Schneider Electric
E-HOUSE AT MULTIPANEL
- We supporting Schneider Electric Malaysia for Offshore plant in India
- E-House (Electrical House) is mobile electrical room for mobile application like offshore
INTEGRATED WATER RESOURCES AND FLOOD MANAGEMENT PROJECT FOR SEMARANG (GRUNDFOS)
- This project is used to regulate the flow of water in the sluice. We control the flooding pumps based on water discharge
- The project is in collaboration with Schneider Electric, Grundfos and DinasPekerjaanUmum
POCARI SWEAT GT & OC3 PLANT
- This project set the production process at the plant OC3 and GT based on temperature and pressure
SAMARINDA NEW AIRPORT
- This project is used to control HVAC and lighting
RFCC CILACAP PERTAMINA
- This project is used to control load shedding system for 3 generator with priority system
REMOTE HANDLING DCR5 PALYJA
- This project is used to control and monitor distribution pump, valve based pressure & flow water
AMPUH PRESSURE MAINTENANCE CHEVRON PASIFIC INDONESIA ON DURI, PEKANBARU
- AmpuhPressure Maintenance Project is intended to manage all of produced water from Ampuh GS and at the same time maintain pressure inside reservoir by re-injecting the water back to the reservoir. The produced water will be injected to 5 candidate injection wells located in Ampuh fields with total injection capacity of 25,000 BWPD (growth case) to fulfil the total design capacity.